CHP biogas equipments over 500 kW

echipament cogenerare biogaz 500 kW

B-Team Energy and Environment presents  2G “avus” modules on biogas with an electrical power, over 500 KW, used for large biogas installations. 

During summer when you need the space being cold, cogeneration plants can increase the overall efficiency through a trigeneration installation with an adsorption chiller.

For the power range over 500KW, 2G uses engines from the best manufacturers in the world Jenbacher and MWM. 

 

 

Typical Applications

  • Waste water treatment plants
  • Waste deposits
  • Agricultural areas
  • Enterprises or factories
  • Cold spaces

 

Tehnical Data

Modules Engine Electrical Thermal Electrical Thermal Total Tehnical
Performance Performance Efficiency Efficiency Efficiency Data
avus 500a Jenbacher 527 kW 625 kW 39,5% 47,6% 87,1% Descarca
avus 500b Jenbacher 637 kW 731 kW 40,5% 46,5% 87,0% Descarca
avus 800a Jenbacher 835 kW 986 kW 40,0% 47,6% 87,6% Descarca
avus 800b Jenbacher 844 kW 865 kW 42,7% 43,8% 86,5% Descarca
avus 1000a Jenbacher 1067 kW 1208 kW 40,9% 46,4% 87,3% Descarca
avus 1000b Jenbacher 1130 kW 1155 kW 42,9% 43,8% 86,7% Descarca
avus 1500b Jenbacher 1413 kW 1442 kW 42,9% 43,8% 86,7% Descarca
avus 500c MWM 600 kW 654 kW 42,0% 45,8% 87,8% Descarca
avus 800c MWM 800 kW 856 kW 42,4% 45,3% 87,2% Descarca
avus 1000c MWM 1200 kW 1195 kW 43,7% 43,5% 87,2% Descarca
avus 1500c MWM 1560 kW 1584 kW 43,3% 43,9% 87,2% Descarca
avus 2000c MWM 2000 kW 1990 kW 43,6% 43,4% 87,0% Descarca
               

Modules noted by "a" and "b" are equipped with Jenbacher engines.

Modules noted by "c" are equipped with MWM engines. 

Photo gallery

Echipamente cu ardere interna pe biogaz cu putere peste 500kW Depozite de deseuri Interprinderi sau fabrici


Request additional details